- Drafting a transportation device for the flow-shop of WEA, payload approx. 920 tons. (S/C)
- Transportation device for a long element of a shipyard, length approx. 200 m (S)
- Increasing the load of a long paternoster with outer and inner additional load (S)
- Airport lifting device, payload 7.5 tons (S/C)
- Airport lifting device, payload 30.0 tons (S)
- Airport transporting device, payload approx. 7.5 tons (S/C)
Footnote:
S: structural analysis
C: construction, i.e. draft, drawing of subassemblies, assemblies and production drawings, overviews, part lists, etc.